[1] Wood A. J., Wollenberg B.F., “Power Generation, Operation, and Control, second edition”, Wiley Publishing, 1996.
[2] Shih, L., “A cost minimization model for coal import strategy”, International Journal of Production Economics, Vol. 51, pp. 243-249, 1997.
[3] Seymore, G. F., “Fuel Scheduling for Electric Power Systems”, Electric Power Problems: The Mathematical Challenge, SIAM, Philadelphia, pp.378-392, 1980.
[4] Rosenberg, L. D., Williams, D. A., Campbell, J. D., “Fuel scheduling and accounting”, EEE Transactions on Power Apparatus and Systems, Vol. 5, pp. 682-688, 1990.
[5] Trefny, F. J., Lee, K. Y., “Economic Fuel Dispatch”, IEEE Transactions on Power Apparatus and Systems, Vol PAS. 100, pp. 3468-3477, 1981.
[6] Basu, M., Chattopadhyay, P. K., “Economic Fuel Scheduling by Hopfield Neural Networks”, Journal- Institution of Engineers India Part EL Electrical Engineering Division, Vol. 86, pp. 305-311, 2006.
[7] Manoharan, P. S., Kannan, P. S., Ramanathan, V., “A Novel EP Approach for Multi-area Economic Dispatch With Multiple Fuel Option”, Turkish Journal of Electrical Engineering & Computer Sciences, Vol. 16, NO. 2, 2008.
[8] Sahin, C., Li, Z., Shahidepour, M., Erkmen, I., “Impact of Natural Gas System on Risk-Constrained Midterm Hydrothermal Scheduling” , IEEE Trans on Power Systems, Vol. 26, NO. 2, 2011.
[9] Shahidepour, M., Yong, Fu., Wiedman, T., “Impact of Natural Gas Infrastructure on Electric Power System”, Proceedings of The IEEE,Vol. 93, NO. 5, 2005.
[10] Chen, H., Baldick, R., “Optimizing Short-Term Natural Gas Supply Portfolio foe Electric Utility Companies”, IEEE Transaction on Power System, Vol. 22, NO. 1, 2007.
[11] Mohsen Asili, Mostafa Rajabi Mashhadi, Mohammad Hosein Javidi, "short-term Programming for supplying the fuel of the powerhouses in conditions of crisis", 23rd international conference on electricity 2008- PSC.
[12] Mohammad Ali Lssemi, Mohsen Asili, "Programing the second fuelsupply of the powerhouses in the crisis conditions of lack of gas fuel regarding the limitations of transfer network", 21st conference of electricity engineering of Iran.
[13] Regulations of the holiday plans and fixing actions in industries of Tavanir Company.
[14] Statistics and information of the company of electricity distribution of Mashhad.